Concrete Pump Hire: Boom Pump vs Line Pump and When You Need One
A ready-mix truck can only put concrete as far as its chute reaches. If the pour is behind a building, up a level, across a garden or on the far side of a hoarding, you either barrow it, which is slow and hard work on any real volume, or you hire a concrete pump. Here is how to tell whether you need one, and which type suits the job.
Do You Need a Concrete Pump?
You almost certainly need a pump if any of these apply:
- The truck cannot reverse close enough to the pour to discharge straight into it
- The concrete has to go up, onto a suspended slab or an upper floor
- The route to the pour is through a house, a narrow side passage or a live site
- The volume is too big to barrow before the concrete starts to stiffen
- The ground between the truck and the pour cannot take a loaded lorry
If the truck can back right up to the formwork and chute it in, you may not need one at all.
Boom Pumps
A boom pump is mounted on a lorry and has a folding hydraulic arm that carries the concrete line through the air. The operator swings the boom over the pour and places concrete exactly where it is needed, over buildings, hoardings and obstacles.
- Best for: large slabs, upper floors and commercial pours where speed matters
- Reach: varies a lot with the size of the pump, so tell the pump company the furthest and highest point you need to reach
- Space: needs room to set up, with outriggers spread on firm ground, plus clear space overhead
Line Pumps
A line pump, sometimes called a static or trailer pump, pushes concrete through a run of pipes and hoses laid along the ground. The pipeline can be routed through narrow gaps, along passages and around corners, and can cover long distances.
- Best for: back gardens, restricted access, footings and smaller pours
- Speed: generally slower than a boom pump
- Set-up: the line has to be laid out before the pour and cleaned out after it
Boom Pump vs Line Pump at a Glance
| Boom pump | Line pump | |
|---|---|---|
| How it places concrete | Through a hydraulic arm, over obstacles | Through pipes laid along the ground |
| Typical jobs | Large slabs, upper floors, commercial pours | Restricted access, gardens, smaller pours |
| Space needed | Room for outriggers and overhead clearance | Room for the pump and a route for the pipeline |
| Speed | Faster | Slower |
Tell Your Supplier the Concrete Is Being Pumped
Not every mix goes through a pump easily. When you order, tell the supplier the concrete is being pumped so the mix is suitable for it. Before the first load goes through, the line is primed with a grout mix to lubricate it, so plan for that at the start of the pour.
At the end of the pour, some concrete stays in the pump hopper and the lines. Allow for it when you work out how much concrete to order.
Setting Up on the Day
- Ground: a boom pump's outriggers put heavy point loads on the ground. Avoid soft ground, fresh backfill and the edges of excavations.
- Overhead: check for power lines, trees and scaffolding before the pump arrives, not when the boom is going up.
- Truck access: the ready-mix trucks need to reverse up to the pump hopper one at a time, so plan where the next truck waits.
- Wash-out: agree a contained area where the trucks and pump can wash out, away from drains.
The Pump Sets the Pace
With one pump on site, only one truck can discharge at a time. If trucks are despatched faster than the pump can take them, they queue, and waiting time charges start once a truck goes past its free unloading window. Agree the delivery interval with the plant based on what the pump can actually place. Our guide to avoiding waiting time charges covers how to set that up.
Common Questions
How far can a concrete pump reach?
It depends entirely on the pump. Boom lengths vary widely between machines, and line pumps can be extended with extra pipe. Give the pump company the distance and height to the furthest point of the pour and let them size it.
Should I book the pump and the concrete for the same time?
Yes. The pump needs to be set up and primed before the first truck arrives, so confirm the pump arrival time and the first delivery time together.
Can a pump work in the rain?
Pumps can work in most weather, but wind, storms and heavy rain can stop a boom pump and affect the pour. Check the forecast and talk to the pump company if the weather looks bad.
Planning a Pumped Pour?
WasteHub arranges ready-mix concrete for commercial projects, alongside the skips and grab lorries on the same job. Tell us the volume, the date and the site, call 0204 638 2307 or get a quote.