Concrete Pour Checklist: How to Prepare Your Site for a Ready-Mix Delivery

21 October 2026 · 4 min read
Formwork and rebar prepared for a concrete pour with a site checklist clipboard

Most problems on a concrete pour are decided before the first truck arrives. The wrong mix, a short order, an inspection that hasn't happened, a pump with nowhere to stand: all of them can be caught days earlier with a proper checklist. Here is the one we would use for a commercial pour, from the week before to the day after.

A Week Before the Pour

  • Confirm the mix. Take the designation straight from the drawings or the engineer's specification, and order exactly that. If you are unsure what the codes mean, see our guide to concrete grades.
  • Measure the volume from the ground. Use the excavation and formwork as they are, not just the drawing dimensions. Our guide on how much concrete you need covers the maths.
  • Book the pump if you need one. Give the pump company the distance and height to the furthest point of the pour. See boom pump vs line pump.
  • Book any inspections. If the work falls under Building Regulations, Building Control usually needs to inspect excavations, and often the reinforcement, before concrete goes in. Check how much notice your building control body needs and book it in good time.
  • Get the supplier's terms in writing. Waiting time, part loads and late cancellation. Our guide to part load charges covers what to ask.
  • Clear the spoil. Excavated soil and broken-out concrete need to be off site before the formwork goes in. Our guide to calculating grab loads helps you book enough.

The Day Before

  • Agree the despatch schedule. Confirm the first truck time and the gap between loads with the plant, based on what the pump or the gang can actually place. This is the single biggest factor in avoiding waiting time charges.
  • Check the forecast overnight and next day. If frost is likely, have frost protection on site. See pouring concrete in cold weather.
  • Walk the route. Check where each truck will turn in, where it waits, and where it reverses to the pump or the pour. Look up for power lines and down for soft ground where the pump's outriggers will go.
  • Set up a wash-out area. Contained, and away from drains.
  • Check the formwork and reinforcement. Make sure it is secure, clean and inspected, with no standing water, debris or ice.
  • Have the kit ready. Vibrators, tamps, floats, covers, and fuel for anything that needs it.

On the Day

  • One person runs the order. Only one named person calls the plant to change timings or call off loads. Two people ringing in different instructions is how trucks end up stacked at the gate.
  • Check every delivery ticket. Before a truck discharges, check the mix and volume on the ticket match what was ordered.
  • Record the times. Note arrival, discharge start and discharge finish for each truck, and keep a copy of every ticket. They are your evidence if a waiting time invoice is disputed later.
  • Hold the balancing load. Measure what is left before calling off the final truck, so you only order what the pour needs.
  • Keep the pour moving. If the despatch rate is running ahead of the site, ring the plant early and slow it down, rather than letting a queue build.

After the Pour

  • Cure and protect. Keep the concrete from drying out too fast in warm weather and from freezing in cold weather.
  • Follow the striking times. Leave formwork in place for as long as the engineer's guidance says. Allow longer in cold weather.
  • Reconcile the invoice. Check every line against the tickets and the supplier's written terms before you pay.

Common Questions

How far ahead should I book ready-mix concrete?

As early as you can once the date is firm, especially for a large pour or one that needs a pump. Plants and pumps get booked up, and busy periods fill quickly.

Who should check the delivery tickets?

Whoever is running the pour, or someone they name. It needs to be one person who knows what was ordered.

What should I do if the wrong mix arrives?

Don't let it discharge. Stop the truck, check the ticket against your order and call the plant before any concrete goes in.

Pour Coming Up?

WasteHub arranges ready-mix concrete for commercial projects, alongside the skips and grab lorries that clear the ground before it. Tell us the mix, the volume and the date, call 0204 638 2307 or get a quote.

Need waste management for your site?

Get a quote in minutes. One point of contact for all your waste needs across London.

EA Registered Waste Carrier
Waste Transfer Notes on Every Job
Full Compliance Documentation
Organised Client Document Folders
Licensed & Insured